The rough in electric work for the basement ADU is complete. This is a video walk through of wiring, oulets, and switches. Next up, rough in plumbing work. Then, it will be ready for a framing and rough in electric and rough in plumbing inspection. Once that is complete, we can start in on insulation and drywall.
Meanwhile, I'm starting to look into cabinets, which take 4 weeks to make. So, it's about time to start in on those.